Bathroom Renovation Toronto

Bathroom renovation in Toronto from AMT Bathroom Renovation Toronto takes your bathroom from demolition to the last fixture: plumbing, waterproofing, tile, vanity, glass and lighting.

We are based downtown at 410 Adelaide St W and pick up the phone 7 days a week, 7 AM to 9 PM, so you talk to a person, not a voicemail.

Call (437) 494-5800 Open 7 days, 7 AM - 9 PM · 410 Adelaide St W, Toronto, ON M5V 1S7
Walk-in glass shower with marble-look porcelain walls and matte black fixtures

Bathroom renovation services in Toronto

Condo bathroom renovation

Condo bathrooms are planned around the building: board approval, elevator bookings, working hours and the unit below you. The job is scheduled around your building's rules before demolition starts, then the bathroom is built to make the most of a condo-sized room.

Condo bathroom renovation in Toronto

How a bathroom renovation works with us

  1. Call. Tell us what you want changed. Photos of the current bathroom help.
  2. Visit and measure. We see the room, the plumbing and, in a condo, the building's rules.
  3. Quote and selections. You get a quote for your bathroom and choose tile, vanity, fixtures and glass before the start date.
  4. Build. Demolition, plumbing, waterproofing, tile, vanity, fixtures and glass.
  5. Walkthrough. We go through the finished bathroom with you.

See more of our work

What every bathroom renovation includes

Whatever the size of the room, the parts you never see decide how long a bathroom lasts: a waterproofing membrane behind and under every shower, the right slope to the drain, solid backing in the walls for vanities, mirrors and grab bars, and an exhaust fan that actually vents outside. The tile and fixtures go on top of that.

Bathroom renovation questions

How much does a bathroom renovation cost in Toronto?

It depends on the size of the room, whether plumbing moves, and the tile, vanity and glass you choose. HomeStars' Toronto price guide puts most full bathroom renovations at about $15,000 to $30,000. You get a quote for your bathroom after we see it.

How long does a bathroom renovation take?

A powder room is much quicker than a full gut ensuite, and condo building rules can limit working hours. You get a timeline for your specific bathroom with the quote. Choosing tile and fixtures before the start date is the biggest thing that keeps a job on schedule.

Do I need a permit to renovate a bathroom in Toronto?

Replacing fixtures in the same location usually does not need a building permit. Adding a bathroom, or adding or relocating drains and vents, generally does. We confirm for your job.

Do you renovate condo bathrooms?

Yes. Our office is downtown at 410 Adelaide St W. See condo bathroom renovation for what your building will ask for.

When can I reach you?

7 days a week, 7 AM to 9 PM, at (437) 494-5800.

Talk to us about your bathroom

Call (437) 494-5800. We answer 7 days a week, 7 AM to 9 PM.

Call (437) 494-5800
Call (437) 494-5800 7 days, 7 AM - 9 PM